ABC/FB65

CHAMPION BUS INC. Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 2002-02-28 Temperature: 85
Personnel: T.S., E.L., M.H., & D.L. Test Load (lbs): 21000
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.089 -0.089 0.010 0.010
2 0.000 0.192 0.192 0.016 0.016
3 0.000 0.124 0.124 0.000 0.000
4 0.000 0.114 0.114 0.002 0.002
5 0.000 0.071 0.071 0.009 0.009
6 0.000 0.531 0.531 0.054 0.054
7 0.000 0.479 0.479 0.048 0.048
8 0.000 0.050 0.050 0.005 0.005
9 0.000 0.084 0.084 0.005 0.005
10 0.000 0.091 0.091 0.006 0.006
11 0.000 0.037 0.037 0.039 0.039
12 0.000 -0.099 -0.099 0.020 0.020

Loading Sequence: 1

Date: 2002-02-28 Temperature: 85
Personnel: T.S., E.L., M.H., & D.L. Test Load (lbs): 21000
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.010 -0.090 -0.100 0.010 0.000
2 0.016 0.221 0.205 0.118 0.102
3 0.000 0.130 0.130 0.000 0.000
4 0.002 0.118 0.116 0.001 -0.001
5 0.009 0.073 0.064 0.010 0.001
6 0.054 0.555 0.501 0.059 0.005
7 0.048 0.481 0.433 0.052 0.004
8 0.005 0.043 0.038 0.003 -0.002
9 0.005 0.070 0.065 0.003 -0.002
10 0.006 0.080 0.074 0.002 -0.004
11 0.039 0.018 -0.021 0.033 -0.006
12 0.020 -0.087 -0.107 0.025 0.005