STREETCAR RTV

WRIGHT GROUP LTD. Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2009-09-23
Personnel S.C.
Temperature (°F) 71
Humidity (%) 85
Wind Direction SW
Wind Speed (MPH) 5
Barometer (in.Hg) 29.97

Test Results

Inspect tow equipment-bus interface <p>A safe and adequate connection was made between the tow equipment and the bus.</p>
Inspect tow equipment-wrecker interface <p>A safe and adequate connection was made between the tow equipment and the wrecker.</p>
Towing Comments <p>A front lift tow was performed incorporating a hydraulic under lift wrecker.</p>
Description and location of any structural damage <p>None noted.</p>
General Comments <p>No problems were encountered with the towing procedures or towing interface.</p>