XDE 40

NEW FLYER Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2010-03-22
Personnel B.L. & T.S.
Temperature (°F) 60
Humidity (%) 83
Wind Direction ESE
Wind Speed (MPH) 10
Barometer (in.Hg) 29.75

Test Results

Inspect tow equipment-bus interface <p>A safe and adequate connection was made between the tow equipment and the bus.</p>
Inspect tow equipment-wrecker interface <p>A safe and adequate connection was made between the tow equipment and the wrecker.</p>
Towing Comments <p>A front lift tow was performed incorporating a hydraulic under lift wrecker.</p>
Description and location of any structural damage <p>No damage or deformation was observed.</p>
General Comments <p>No problems with the tow or towing interface were encountered during the test.</p>