60 LFS ARTIC

NOVA BUS Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2008-08-28
Personnel S.C.
Temperature (°F) 69
Humidity (%) 100
Wind Direction SE
Wind Speed (MPH) 7
Barometer (in.Hg) 29.98

Test Results

Inspect tow equipment-bus interface <p>A safe and adequate connection was made betweent he tow equipment and the bus.</p>
Inspect tow equipment-wrecker interface <p>A safe and adequate connection was made between the tow equipment and the wrecker.</p>
Towing Comments <p>A front lift tow was performed incorporating a hydraulic under lift wrecker.</p>
Description and location of any structural damage <p>No damage or deformation was observed.</p>
General Comments <p>No problems with the tow or towing interface were encountered.</p>