Ford F550

GOSHEN COACH Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 2010-04-06 Temperature: 62
Personnel: T.S., E.D., E.L., P.D., & B.L. Test Load (lbs): 15075
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.211 -0.211 -0.023 -0.023
2 0.000 0.154 0.154 0.014 0.014
3 0.000 0.266 0.266 0.021 0.021
4 0.000 0.304 0.304 0.024 0.024
5 0.000 0.296 0.296 0.028 0.028
6 0.000 0.116 0.116 0.004 0.004
7 0.000 0.026 0.026 -0.026 -0.026
8 0.000 0.268 0.268 0.018 0.018
9 0.000 0.378 0.378 0.016 0.016
10 0.000 0.222 0.222 0.011 0.011
11 0.000 0.132 0.132 0.008 0.008
12 0.000 -0.186 -0.186 -0.007 -0.007

Loading Sequence: 2

Date: 2010-04-06 Temperature: 72
Personnel: T.S., E.D., E.L., P.D., & B.L. Test Load (lbs): 15075
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 -0.023 -0.211 -0.188 -0.028 -0.005
2 0.014 0.157 0.143 0.016 0.002
3 0.021 0.273 0.252 0.021 0.000
4 0.024 0.313 0.289 0.026 0.002
5 0.028 0.306 0.278 0.029 0.001
6 0.004 0.101 0.097 0.007 0.003
7 -0.026 -0.011 0.015 -0.028 -0.002
8 0.018 0.272 0.254 0.021 0.003
9 0.019 0.279 0.260 0.019 0.000
10 0.011 0.222 0.211 0.012 0.001
11 0.008 0.130 0.122 0.010 0.002
12 -0.007 -0.183 -0.176 -0.012 -0.005