VIP 2200

DIAMOND COACH CORPORATION Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 2010-04-13 Temperature: 62
Personnel: E.D., E.L., B.L., & p.d. Test Load (lbs): 8325
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.107 -0.107 -0.014 -0.014
2 0.000 0.100 0.100 0.018 0.018
3 0.000 0.171 0.171 0.024 0.024
4 0.000 0.251 0.251 0.041 0.041
5 0.000 0.295 0.295 0.047 0.047
6 0.000 2.000 2.000 0.007 0.007
7 0.000 -0.024 -0.024 -0.008 -0.008
8 0.000 0.285 0.285 0.038 0.038
9 0.000 0.254 0.254 0.032 0.032
10 0.000 0.180 0.180 0.022 0.022
11 0.000 0.099 0.099 0.013 0.013
12 0.000 -0.145 -0.145 -0.021 -0.021

Loading Sequence: 2

Date: 2010-04-13 Temperature:
Personnel: E.D., E.L., B.L., & P.D. Test Load (lbs): 8325
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 -0.014 -0.096 -0.082 -0.018 -0.004
2 0.018 0.098 0.080 0.020 0.002
3 0.024 0.167 0.143 0.028 0.004
4 0.041 0.244 0.203 0.043 0.002
5 0.047 0.284 0.237 0.048 0.001
6 0.007 0.001 -0.006 0.006 -0.001
7 -0.008 -0.068 -0.060 -0.007 0.001
8 0.038 0.275 0.237 0.039 0.001
9 0.032 0.246 0.214 0.033 0.001
10 0.022 0.177 0.155 0.024 0.002
11 0.013 0.198 0.185 0.013 0.000
12 -0.021 -0.142 -0.121 -0.026 -0.005