Model Universal CNG

GLAVAL BUS/DIV. OF FOREST RIVER Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2010-10-07
Personnel S.C. & T.S.
Temperature (°F) 70
Humidity (%) 65
Wind Direction SW
Wind Speed (MPH) 8
Barometer (in.Hg) 30.05

Test Results

Inspect tow equipment-bus interface <p>A safe and adequate connection was made between the tow equipment and the bus.</p>
Inspect tow equipment-wrecker interface <p>A safe and adquate connection was made between the tow equipment and the wrecker.</p>
Towing Comments <p>A front lift tow was performed incorporating a hydraulic under left wrecker.</p>
Description and location of any structural damage <p>No damage or deformation was observed.</p>
General Comments <p>No problems with the tow or towing interface were encountered.</p>