President/Trolley

Star Trans by Supreme Corp. Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2010-12-08
Personnel S.C.
Temperature (°F) 31
Humidity (%) 55
Wind Direction NW
Wind Speed (MPH) 10
Barometer (in.Hg) 29.97

Test Results

Inspect tow equipment-bus interface <p>A safe and adequate connection was made between the tow equipment and the bus.</p>
Inspect tow equipment-wrecker interface <p>A safe and adequate connection was made between the tow equipment and the wrecker.</p>
Towing Comments <p>A front lift tow was performed incorporating a hydraulic under lift wrecker.</p>
Description and location of any structural damage <p>No damage or deformation observed.</p>
General Comments <p>No problem with the tow or towing interface were encountered during the test.&nbsp; The test was completed with no damage or deformation to the test vehicle.</p>