Senator HD Cutaway

SUPREME CORPORATION Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2011-06-14
Personnel T.S., E.D. & E.L.
Temperature (°F) 36
Humidity (%) 77
Wind Direction SW
Wind Speed (MPH) 3
Barometer (in.Hg) 29.97

Test Results

Inspect tow equipment-bus interface <p>A safe and adequate connection was made between the tow equipment and the test bus.</p>
Inspect tow equipment-wrecker interface <p>A safe and adequate connection was made between the tow equipment and the wrecker.</p>
Towing Comments <p>A front lift tow was performed incorporating a hydraulic under lift wrecker.</p>
Description and location of any structural damage <p>None noted.</p>
General Comments <p>No problems with the tow or towing interface were encountered.</p>