Static Towing Test Data Form
Date:
|
2011-06-22
|
Personnel:
|
T.S., S.C., E.D., E.L. & B.L.
|
Temperature:
|
80
|
Inspect right front tow eye and adjoining structure. |
Comments:
No damage or deformation observed.
|
Check the torque of all bolts attaching tow eye and surrounding structure. |
Comments:
Welds inspected
|
Inspect left front tow eye and adjoining structure. |
Comments:
No damage or deformation observed.
|
Check the torque of all bolts attaching tow eye and surrounding structure. |
Comments:
Welds inspected.
|
Inspect right rear tow eye and adjoining structure. |
Comments:
|
Check the torque of all bolts attaching tow eye and surrounding structure. |
Comments:
|
Inspect left rear tow eye and adjoining structure. |
Comments:
|
Check the torque of all bolts attaching tow eye and surrounding structure. |
Comments:
|
General comments of any other structure deformation or failure: |
<p>All 4 front pulls were completed to the full target test load of 16,260 lbs. (1.2x12,550 lbs CW), with no damage or deformation observed. The manufacturer does not recommend rear towing, therefore a rear test was not performed.</p> |
|
|
General
Check-In
Maintainability
Repair & Maintenance
Replacement & Repair
Reliability
Safety
Performance
Structural
Fuel Economy
Noise
Glossary
Back to Bus List
|