Low Floor
GILLIG CORPORATION
|
Date: | 2011-12-19 |
Personnel: | E.L., T.S., J.P., B.L. & E.D. |
Temperature: | 38 |
Inspect right front tow eye and adjoining structure. |
---|
Comments: No damage or deformation observed. |
Check the torque of all bolts attaching tow eye and surrounding structure. |
Comments: Torques verified |
Inspect left front tow eye and adjoining structure. |
Comments: No damage or deformation observed. |
Check the torque of all bolts attaching tow eye and surrounding structure. |
Comments: Torques verified. |
Inspect right rear tow eye and adjoining structure. |
Comments: |
Check the torque of all bolts attaching tow eye and surrounding structure. |
Comments: |
Inspect left rear tow eye and adjoining structure. |
Comments: |
Check the torque of all bolts attaching tow eye and surrounding structure. |
Comments: |
General comments of any other structure deformation or failure: |
<p>None noted. All 4 front pulls were completed to the target test load of 31,572 lbs. 1.2x26,310 lbs CW.</p> |
General
Check-In
Back to Bus List
- Summary
- Weight
- Clearances
- Body Details
- Engine
- Transmission
- Suspension
- Wheels & Tires
- Brakes
- HVAC
- Steering
- Capacities
- Misc.
- Components
- Spare Parts
- Integrity Summary
- Shakedown
- Distortion Summary
- Distortion Test
- Static Towing Summary
- Static Towing Test
- Dynamic Towing Summary
- Dynamic Towing Test
- Jacking Summary
- Jacking Test
- Hoisting Summary
- Hoisting Test
- Durability Summary
- Durability Mileage
- Unscheduled Maintenance
- Interior Summary
- Stationary Test
- Acceleration Test
- Vibration Test
- Exterior Summary
- Constant Acceleration
- Standstill Acceleration
- Stationary
Back to Bus List