EXCEL 102

BLUE BIRD CORPORATION Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2003-04-14
Personnel S.C.
Temperature (°F) 50
Humidity (%) 27
Wind Direction sw
Wind Speed (MPH) 6
Barometer (in.Hg) 30.65

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connections was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift wrecker.
Description and location of any structural damage
General Comments Tow was performed with no problems noted.