Defender/Challenger/American Coach F-550 CNG

CHAMPION MOTOR COACH, INC. Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2012-11-29
Personnel B.L. & S.R.
Temperature (°F) 41
Humidity (%) 39
Wind Direction WSW
Wind Speed (MPH) 10
Barometer (in.Hg) 30.33

Test Results

Inspect tow equipment-bus interface <p>A safe and adequate condition was made between the tow equipment and the bus.</p>
Inspect tow equipment-wrecker interface <p>A safe and adequate connection was made between the tow equipment and the wrecker.</p>
Towing Comments <p>A tow lift was performed incorporating a hydraulic unser lift wrecker.</p>
Description and location of any structural damage <p>None noted.</p>
General Comments <p>No problems with the towing interface or towing procedures were encountered.</p>