BE-35

PROTERRA, INC. Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 2011-04-28 Temperature: 66
Personnel: T.S., E.D., P.D., & B,L. Test Load (lbs): 23325
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.068 -0.068 0.001 0.001
2 0.000 0.038 0.038 0.007 0.007
3 0.000 0.088 0.088 0.007 0.007
4 0.000 0.095 0.095 0.008 0.008
5 0.000 0.067 0.067 0.007 0.007
6 0.000 0.173 0.173 0.009 0.009
7 0.000 0.182 0.182 0.012 0.012
8 0.000 0.040 0.040 0.005 0.005
9 0.000 0.067 0.067 0.002 0.002
10 0.000 0.062 0.062 0.001 0.001
11 0.000 0.022 0.022 0.000 0.000
12 0.000 -0.065 -0.065 -0.008 -0.008

Loading Sequence: 2

Date: 2011-05-02 Temperature: 65
Personnel: T.S., E.D., P.D., & B,L. Test Load (lbs): 23325
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.001 0.014 0.013 0.014 0.013
2 0.005 0.042 0.037 0.006 0.001
3 0.007 0.088 0.081 0.008 0.001
4 0.008 0.094 0.086 0.008 0.000
5 0.007 0.065 0.058 0.007 0.000
6 0.009 0.159 0.150 0.023 0.014
7 0.012 0.174 0.162 0.026 0.014
8 0.005 0.044 0.039 0.006 0.001
9 0.002 0.060 0.058 0.000 -0.002
10 0.001 0.057 0.056 0.000 -0.001
11 0.000 0.025 0.025 0.000 0.000
12 -0.008 0.014 0.022 0.002 0.010

Loading Sequence: 3

Date: 2011-05-03 Temperature: 64
Personnel: T.S., E.D., P.D., & B,L. Test Load (lbs): 23325
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.013 0.018 0.005 0.016 0.003
2 0.001 0.044 0.043 0.005 0.004
3 0.001 0.092 0.091 0.005 0.004
4 0.000 0.096 0.096 0.004 0.004
5 0.000 0.067 0.067 0.005 0.005
6 0.014 0.169 0.155 0.018 0.004
7 0.014 0.179 0.165 0.019 0.005
8 0.001 0.043 0.042 0.002 0.001
9 -0.002 0.060 0.062 0.001 0.003
10 -0.001 0.057 0.058 0.000 0.001
11 0.000 0.026 0.026 0.001 0.001
12 0.010 0.018 0.008 0.015 0.005