BE-35

PROTERRA, INC. Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2012-02-03
Personnel T.S.
Temperature (°F) 37
Humidity (%) 56
Wind Direction NW
Wind Speed (MPH) 6
Barometer (in.Hg) 30.47

Test Results

Inspect tow equipment-bus interface <p>A safe and adequate connection was made between the tow equipment and the bus.</p>
Inspect tow equipment-wrecker interface <p>A front lift tow was performed incorporating a hydraulic under lift wrecker.</p>
Towing Comments <p>A front lift tow was performed incorporating a hydraulic under lift wrecker.</p>
Description and location of any structural damage <p>No damage or deformation was observed.</p>
General Comments <p>No problems were encountered with the tow or towing interface.</p>