Enhanced Electric

Designline USA, LLC Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2012-05-07
Personnel T.S. & B.L.
Temperature (°F) 57
Humidity (%) 94
Wind Direction Calm
Wind Speed (MPH) Calm
Barometer (in.Hg) 30.03

Test Results

Inspect tow equipment-bus interface <p>A safe and adequate connection was made between the tow equipment and the bus.</p>
Inspect tow equipment-wrecker interface <p>A safe and adequate connection was made between the tow equipment and the bus</p>
Towing Comments <p>A front lift tow was performed incorporating a hydraulic underlift wrecker.</p>
Description and location of any structural damage <p>None noted.</p>
General Comments <p>No problems with the towing interface or towing procedures were encountered.&nbsp;</p>