E-450

Winnebago Industries, Inc. Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 2012-07-10 Temperature: 79
Personnel: E.L., P.D., M.R. & G.C. Test Load (lbs): 9075
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.067 -0.067 0.011 0.011
2 0.000 0.080 0.080 0.009 0.009
3 0.000 0.098 0.098 0.014 0.014
4 0.000 0.143 0.143 0.010 0.010
5 0.000 0.143 0.143 0.010 0.010
6 0.000 -0.019 -0.019 0.000 0.000
7 0.000 -0.035 -0.035 0.001 0.001
8 0.000 0.143 0.143 0.008 0.008
9 0.000 0.150 0.150 0.017 0.017
10 0.000 0.119 0.119 0.004 0.004
11 0.000 0.065 0.065 0.006 0.006
12 0.000 -0.070 -0.070 0.006 0.006

Loading Sequence: 2

Date: 2012-07-10 Temperature: 84
Personnel: E.L., P.D., M.R. & G.C. Test Load (lbs): 9075
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.011 -0.064 -0.075 0.013 0.002
2 0.009 0.084 0.075 0.013 0.004
3 0.014 0.105 0.091 0.016 0.002
4 0.010 0.151 0.141 0.015 0.005
5 0.010 0.155 0.145 0.015 0.005
6 0.000 -0.030 -0.030 0.005 0.005
7 0.001 -0.045 -0.046 0.003 0.002
8 0.008 0.150 0.142 0.010 0.002
9 0.017 0.162 0.145 0.020 0.003
10 0.004 0.120 0.116 0.005 0.001
11 0.006 0.068 0.062 0.010 0.004
12 0.006 -0.065 -0.071 0.010 0.004