CNG 45' Coach

DESIGNLINE USA, LLC Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2012-11-30
Personnel B.L. & S.R.
Temperature (°F) 34
Humidity (%) 65
Wind Direction SW
Wind Speed (MPH) 7
Barometer (in.Hg) 30.35

Test Results

Inspect tow equipment-bus interface <p>A safe and adequate connection was made between the town equipment and the bus.</p>
Inspect tow equipment-wrecker interface <p>A safe and adequate connection was made between the tow equipment and the wrecker.</p>
Towing Comments <p>A front lift tow was performed incorporating a hydraulic under lift wrecker.</p>
Description and location of any structural damage <p>None noted.</p>
General Comments <p>No prolems with the towing interface or towing procedures were encountered.</p>