CNG 45' Coach

DESIGNLINE USA, LLC Pdf Download PDF Report

Static Towing Test Data Form

Date: 2012-12-19
Personnel: T.S., E.D., B.L., P.D. & S.R.
Temperature: 39

 

Inspect right front tow eye and adjoining structure.
Comments: No damage or deformation observed.
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: Welds inspected.
Inspect left front tow eye and adjoining structure.
Comments: No damage or deformation abserved.
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: Welds Inspected
Inspect right rear tow eye and adjoining structure.
Comments: N/A
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: N/A
Inspect left rear tow eye and adjoining structure.
Comments: N/A
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: N/A
General comments of any other structure deformation or failure:
<p>The 20&deg; up pull was not performed due to guaranteed damage due to interference with then 20&deg; angle.&nbsp;&nbsp; The other 3 pulls were complete with no damage or deformation observed.&nbsp; The 3 pulls completed to a target test load of 45.120 lbs. 1.2 x 37,600 lbs. CW.</p>