Advantage 240

ELDORADO NATIONAL Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2012-11-29
Personnel B.L. & S.R.
Temperature (°F) 44
Humidity (%) 31
Wind Direction W
Wind Speed (MPH) 9.2
Barometer (in.Hg) 30.27

Test Results

Inspect tow equipment-bus interface <p>A safe and adequate connection was made between the town equipment and the bus.</p>
Inspect tow equipment-wrecker interface <p>A safe and adequate connection was made between the town equipment and the wrecker.</p>
Towing Comments <p>A front lift tow was performed incorporating a hydraulic under life wrecker.</p>
Description and location of any structural damage <p>None noted.</p>
General Comments <p>No problems with the towing interface or towing procedures were encountered.</p>