CNG LFS 40

NOVA BUS, DIVISION OF VOLVO GROUP CANADA Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2014-01-14
Personnel S.R. & T.S.
Temperature (°F) 48
Humidity (%) 73
Wind Direction W
Wind Speed (MPH) 3
Barometer (in.Hg) 28.43

Test Results

Inspect tow equipment-bus interface <p>A safe and adequate connection was made between the towing equipment and the bus.</p>
Inspect tow equipment-wrecker interface <p>A safe and adequate connection was made between the towing equipment and wrecker.</p>
Towing Comments <p>A front lift tow was performed incorporating hydraulic under lift wrecker.</p>
Description and location of any structural damage <p>None noted.</p>
General Comments <p>No problems with the towing interface or towing procedures were encountered.</p>