Student Safety Transporter (SST)

Chestnut Ridge dba Trans Tech Bus, a Transportation Collaborative Co. Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2014-03-26
Personnel T.S., S.R. & E.D.
Temperature (°F) 23
Humidity (%) 39
Wind Direction NW
Wind Speed (MPH) 18
Barometer (in.Hg) 30.02

Test Results

Inspect tow equipment-bus interface <p>A safe and adequate connection was made between the tow equipment and the bus.</p>
Inspect tow equipment-wrecker interface <p>A safe and adequate connection was made between the tow equipment and the wrecker.</p>
Towing Comments <p>A front lift tow was performed incorporating a hydraulic wheel lift wrecker.</p>
Description and location of any structural damage <p>None noted.</p>
General Comments <p>No problems with the towing interface or towing procedures were encountered.</p>