2014

Double K, Inc. dba Hometown Trolley Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2014-09-09
Personnel T.S., S.R. & J.P.
Temperature (°F) 66
Humidity (%) 6
Wind Direction E
Wind Speed (MPH) 6
Barometer (in.Hg) 30.02

Test Results

Inspect tow equipment-bus interface <p>A safe and adequate connection was made between the tow equipment and the bus.</p>
Inspect tow equipment-wrecker interface <p>A safe and adequate connection was made between the tow equipment and the wrecker.</p>
Towing Comments <p>A front lift tow was performed incorporating a hydraulic under-lift wrecker.</p>
Description and location of any structural damage <p>None noted.</p>
General Comments <p>None noted.</p>