Axess HD

ELDORADO NATIONAL Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2014-09-09
Personnel T.S., S.R. & J.P.
Temperature (°F) 66
Humidity (%)
Wind Direction E
Wind Speed (MPH) 4
Barometer (in.Hg)

Test Results

Inspect tow equipment-bus interface <p>A safe and adequate connection was made between the towing equipment and the bus.</p>
Inspect tow equipment-wrecker interface <p>A safe and adequate conection was made between the towing equipment and the wrecker.</p>
Towing Comments <p>A front lift tow was performed incorporating a hydraulic under lift wrecker.</p>
Description and location of any structural damage <p>None noted.</p>
General Comments <p>No problems with the towing interface or towing procedures were encountered.</p>