ARRIVO

ELDORADO NATIONAL Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 2014-05-07 Temperature: 64
Personnel: T.S., E.D., P.D., S.R. & J.P. Test Load (lbs): 22500
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 0.133 0.133 0.030 0.030
2 0.000 0.088 0.088 0.008 0.008
3 0.000 0.199 0.199 0.025 0.025
4 0.000 0.311 0.311 0.054 0.054
5 0.000 0.317 0.317 0.056 0.056
6 0.000 0.077 0.077 0.023 0.023
7 0.000 0.049 0.049 0.013 0.013
8 0.000 0.183 0.183 0.026 0.026
9 0.000 0.194 0.194 0.025 0.025
10 0.000 0.159 0.159 0.019 0.019
11 0.000 0.085 0.085 0.014 0.014
12 0.000 0.097 0.097 0.023 0.023

Loading Sequence: 2

Date: 2014-05-07 Temperature: 60
Personnel: T.S., S.R., E.D., E.L., T.G., P.D. & J.P. Test Load (lbs): 22500
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.030 0.126 0.096 0.029 -0.001
2 0.008 0.093 0.085 0.009 0.001
3 0.025 0.206 0.181 0.027 0.002
4 0.054 0.310 0.256 0.058 0.004
5 0.056 0.320 0.264 0.059 0.003
6 0.023 0.077 0.054 0.025 0.002
7 0.013 0.052 0.039 0.014 0.001
8 0.026 0.191 0.165 0.027 0.001
9 0.025 0.201 0.176 0.028 0.003
10 0.019 0.164 0.145 0.022 0.003
11 0.014 0.089 0.075 0.017 0.003
12 0.023 0.091 0.068 0.021 -0.002