Dynamic Towing Test Data Form

Date 2014-12-10
Personnel T.S. & S.R.
Temperature (°F) 35
Humidity (%)
Wind Direction NW
Wind Speed (MPH) 13
Barometer (in.Hg)

Test Results

Inspect tow equipment-bus interface <p>A safe and adequate connection was made between the tow equipment and the bus.</p>
Inspect tow equipment-wrecker interface <p>A safe and adequate connection was made between the tow equipment and the wrecker.</p>
Towing Comments <p>A front lift tow was performed incorporating a hydraulic under lift wrecker.</p>
Description and location of any structural damage <p>None noted.</p>
General Comments <p>No problems with the towing interface or tow procedures were encountered.</p>