BE40

PROTERRA, INC. Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2015-03-30
Personnel S.R., T.G., E.L., J.P. & P.D.
Temperature (°F) 43
Humidity (%)
Wind Direction WNW
Wind Speed (MPH) 18
Barometer (in.Hg)

Test Results

Inspect tow equipment-bus interface <p>A safe and adequate connection was made between the tow equipment and the bus.</p>
Inspect tow equipment-wrecker interface <p>A safe and adequate connection was made between the tow equipment and the bus.</p>
Towing Comments <p>A front lift tow was perfromed incorporationg a hydraulic under lift wrecker.</p>
Description and location of any structural damage <p>None noted.</p>
General Comments <p>No problems with the towing interface or procedures were encountered.</p>