E500

ALEXANDER DENNIS INC. Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2015-03-30
Personnel S.R., T.G., E.L., J.P. & P.D.
Temperature (°F) 43
Humidity (%)
Wind Direction WNW
Wind Speed (MPH) 18
Barometer (in.Hg)

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the bus and the towing equipment.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under-lift wrecker.
Description and location of any structural damage None noted.
General Comments No problems with the towing interface or procedures were encountered.