XE40

NEW FLYER Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2015-03-13
Personnel S.R., E.D., E.L. & J.P.
Temperature (°F) 41
Humidity (%)
Wind Direction SSW
Wind Speed (MPH) 11
Barometer (in.Hg)

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the towing equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the towing equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift wrecker.
Description and location of any structural damage None needed.
General Comments No problems with the towing interface or procedures were encountered.