World Trans E26

ELDORADO NATIONAL KANSAS D.B.A. WORLD TRANS Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2016-06-20
Personnel E.D. & P.D.
Temperature (°F) 76
Humidity (%)
Wind Direction S
Wind Speed (MPH) 4
Barometer (in.Hg)

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made.
Inspect tow equipment-wrecker interface A safe and adequate connection was made.
Towing Comments A front lift tow was performed using a wheel lift.
Description and location of any structural damage None noted.
General Comments None noted.