Starlite Transit

Starcraft Bus a Division of Forest River, Inc. Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2016-07-28
Personnel T.S. & E.D.
Temperature (°F) 79
Humidity (%)
Wind Direction SSW
Wind Speed (MPH) 1
Barometer (in.Hg)

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift wrecker.
Description and location of any structural damage None noted.
General Comments No problems with the towing interface or towing procedures were encountered.