T24

Collins Bus Corp. d.b.a. World Trans Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2016-12-13
Personnel S.R. & T.G.
Temperature (°F) 30
Humidity (%)
Wind Direction SSW
Wind Speed (MPH) 5
Barometer (in.Hg)

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift wrecker.
Description and location of any structural damage None noted.
General Comments Manufacturer does not recommend towing from the rear.