Concorde II

GLAVAL BUS/DIV. OF FOREST RIVER Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 2016-03-18 Temperature: 65
Personnel: S.R.,E.L.,J.P.,J.S.,M.H.,C.S.,R.S. & M.R. Test Load (lbs): 15
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.081 -0.081 -0.003 -0.003
2 0.000 0.091 0.091 0.009 0.009
3 0.000 0.137 0.137 0.012 0.012
4 0.000 0.149 0.149 0.013 0.013
5 0.000 0.111 0.111 0.013 0.013
6 0.000 0.179 0.179 0.016 0.016
7 0.000 0.170 0.170 0.011 0.011
8 0.000 0.079 0.079 0.009 0.009
9 0.000 0.129 0.129 0.011 0.011
10 0.000 0.134 0.134 0.011 0.011
11 0.000 0.054 0.054 0.006 0.006
12 0.000 -0.078 -0.078 0.000 0.000

Loading Sequence: 2

Date: 2016-03-18 Temperature: 64
Personnel: S.R.,E.L.,J.P.,J.S.,M.H.,C.S.,R.S. & M.R. Test Load (lbs): 15
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 -0.003 -0.092 -0.089 -0.001 0.002
2 0.009 0.099 0.090 0.008 -0.001
3 0.012 0.148 0.136 0.011 -0.001
4 0.013 0.162 0.149 0.013 0.000
5 0.013 0.122 0.109 0.012 -0.001
6 0.016 0.158 0.142 0.014 -0.002
7 0.011 0.148 0.137 0.012 0.001
8 0.009 0.091 0.082 0.009 0.000
9 0.011 0.144 0.133 0.009 -0.002
10 0.011 0.148 0.137 0.009 -0.002
11 0.006 0.061 0.055 0.004 -0.002
12 0.000 -0.087 -0.087 -0.001 -0.001