Concorde II

GLAVAL BUS/DIV. OF FOREST RIVER Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2017-02-15
Personnel T.S.,S.R. & E.L.
Temperature (°F) 39
Humidity (%)
Wind Direction NNW
Wind Speed (MPH) 9
Barometer (in.Hg)

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift wrecker.
Description and location of any structural damage None noted.
General Comments None other noted.