GC II 8551

GOSHEN COACH Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 2002-10-30 Temperature: 68
Personnel: S.C., T.S., E.D. & E.L. Test Load (lbs): 13125
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 0.083 0.083 0.090 0.090
2 0.000 0.078 0.078 0.055 0.055
3 0.000 0.072 0.072 0.036 0.036
4 0.000 0.050 0.050 0.024 0.024
5 0.000 0.029 0.029 0.012 0.012
6 0.000 0.258 0.258 0.026 0.026
7 0.000 0.238 0.238 0.005 0.005
8 0.000 0.014 0.014 -0.001 -0.001
9 0.000 0.034 0.034 0.002 0.002
10 0.000 0.046 0.046 0.006 0.006
11 0.000 0.033 0.033 0.010 0.010
12 0.000 0.015 0.015 0.030 0.030

Loading Sequence: 1

Date: 2002-10-30 Temperature: 68
Personnel: S.C., T.S., E.D. & E.L. Test Load (lbs): 13125
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.090 0.084 -0.006 0.092 0.002
2 0.055 0.078 0.023 0.055 0.000
3 0.036 0.072 0.036 0.036 0.000
4 0.024 0.050 0.026 0.024 0.000
5 0.017 0.029 0.012 0.012 -0.005
6 0.026 0.273 0.247 0.030 0.004
7 0.005 0.250 0.245 0.009 0.004
8 -0.001 0.014 0.015 -0.002 -0.001
9 0.002 0.035 0.033 0.004 0.002
10 0.006 0.047 0.041 0.006 0.000
11 0.010 0.034 0.024 0.012 0.002
12 0.030 0.013 -0.017 0.032 0.002