P31432

MOLLY CORPORATION Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2001-06-22
Personnel S.C. & T.S.
Temperature (°F) 75
Humidity (%) 80
Wind Direction W
Wind Speed (MPH) 6
Barometer (in.Hg) 30.05

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed using a hydraulic lift wrecker. No problems were encountered with the towing interface.
Description and location of any structural damage Note noted.
General Comments None