DE60LF

NEW FLYER Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2003-10-06
Personnel E.D. and E.L.
Temperature (°F) 65
Humidity (%) 52
Wind Direction E
Wind Speed (MPH) 3
Barometer (in.Hg) 30.14

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift wrecker.
Description and location of any structural damage
General Comments No problems with the towing interface or towing procedures were encountered.