45CLFW-CNG

NORTH AMERICAN BUS INDUSTRIES Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2003-07-18
Personnel S.C. & T.S.
Temperature (°F) 78
Humidity (%) 60
Wind Direction SW
Wind Speed (MPH) 5
Barometer (in.Hg) 30.03

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift wrecker. No problems with the towing interface were encountered.
Description and location of any structural damage
General Comments none