AXESS

ELDORADO NATIONAL Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2003-11-12
Personnel S.C. and T.S.
Temperature (°F) 52
Humidity (%) 64
Wind Direction calm
Wind Speed (MPH) calm
Barometer (in.Hg) 30.05

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift wrecker.
Description and location of any structural damage
General Comments None.