0314

NEOPLAN USA CORPORATION Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2003-11-12
Personnel S.C. and T.S.
Temperature (°F) 52
Humidity (%) 64
Wind Direction Calm
Wind Speed (MPH) calm
Barometer (in.Hg) 30.05

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift wrecker. No damage or deformation was observed during the tow and no problems were encountered with the towing interface. Rear towing is not recommended.
Description and location of any structural damage None noted
General Comments None