CMD-55

COACH & EQUIPMENT Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 2003-07-07 Temperature: 85
Personnel: E.L., M.H., & T.S. Test Load (lbs): 10200
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.094 -0.094 0.000 0.000
2 0.000 0.173 0.173 0.010 0.010
3 0.000 0.117 0.117 0.013 0.013
4 0.000 0.155 0.155 0.029 0.029
5 0.000 0.268 0.268 0.030 0.030
6 0.000 0.099 0.099 -0.012 -0.012
7 0.000 0.096 0.096 -0.002 -0.002
8 0.000 0.144 0.144 0.015 0.015
9 0.000 0.141 0.141 0.014 0.014
10 0.000 0.120 0.120 0.011 0.011
11 0.000 0.155 0.155 0.006 0.006
12 0.000 -0.097 -0.097 0.000 0.000

Loading Sequence: 1

Date: 2003-07-07 Temperature: 85
Personnel: E.L., M.H., & T.S. Test Load (lbs): 10200
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.098 -0.098 0.000 0.000
2 0.010 0.173 0.163 0.013 0.003
3 0.013 0.116 0.103 0.015 0.002
4 0.029 0.159 0.130 0.030 0.001
5 0.030 0.162 0.132 0.030 0.000
6 -0.012 0.002 0.014 -0.012 0.000
7 -0.002 0.001 0.003 0.002 0.004
8 0.015 0.153 0.138 0.017 0.002
9 0.014 0.151 0.137 0.015 0.001
10 0.011 0.128 0.117 0.012 0.001
11 0.006 0.159 0.153 0.008 0.002
12 0.000 -0.099 -0.099 0.000 0.000