CMD-55

COACH & EQUIPMENT Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2003-09-16
Personnel E.L. and E.D.
Temperature (°F) 70
Humidity (%) 60
Wind Direction W
Wind Speed (MPH) 3
Barometer (in.Hg) 30.21

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift wrecker.
Description and location of any structural damage
General Comments No problem with the towing interface or tow process was encountered.