D40I INVERO

NEW FLYER Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2003-11-12
Personnel S.C. & T.S.
Temperature (°F) 52
Humidity (%) 64
Wind Direction Calm
Wind Speed (MPH) Calm
Barometer (in.Hg) 30.05

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift wrecker.
Description and location of any structural damage None noted.
General Comments The bus manufacturer does not recommend towing from the rear, therefore, a rear test was not performed.