TITAN

GLAVAL BUS Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2004-04-29
Personnel D.L., E.L., and K.D.
Temperature (°F) 70
Humidity (%) 30
Wind Direction w
Wind Speed (MPH) 7
Barometer (in.Hg) 30.06

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments None noted.
Description and location of any structural damage
General Comments No problems were encountered with the towing interface.