KIDETTE

CORBEIL, INC. Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2004-02-10
Personnel S.C.
Temperature (°F) 37
Humidity (%) 64
Wind Direction calm
Wind Speed (MPH) calm
Barometer (in.Hg) 30.12

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift wrecker. Rear towing is not recommended.
Description and location of any structural damage
General Comments None.