STARTRANS 31' RAII

SUPREME CORPORATION Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 2003-11-13 Temperature: 50
Personnel: E.L., E.D., and D.L. Test Load (lbs): 17250
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.021 -0.021 0.000 0.000
2 0.000 0.211 0.211 0.560 0.560
3 0.000 0.197 0.197 0.038 0.038
4 0.000 0.218 0.218 0.045 0.045
5 0.000 0.180 0.180 0.040 0.040
6 0.000 0.183 0.183 0.019 0.019
7 0.000 0.132 0.132 0.003 0.003
8 0.000 0.155 0.155 0.023 0.023
9 0.000 0.193 0.193 0.026 0.026
10 0.000 0.178 0.178 0.029 0.029
11 0.000 0.110 0.110 0.015 0.015
12 0.000 -0.030 -0.030 -0.004 -0.004

Loading Sequence: 1

Date: 2003-11-13 Temperature: 50
Personnel: E.L., E.D., and D.L. Test Load (lbs): 17250
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.021 -0.021 -0.003 -0.003
2 0.056 0.216 0.160 0.053 -0.003
3 0.038 0.217 0.179 0.042 0.004
4 0.045 0.239 0.194 0.048 0.003
5 0.040 0.197 0.157 0.044 0.004
6 0.019 0.146 0.127 0.019 0.000
7 0.003 0.194 0.191 0.004 0.001
8 0.023 0.165 0.142 0.027 0.004
9 0.026 0.206 0.180 0.029 0.003
10 0.029 0.195 0.166 0.031 0.002
11 0.015 0.121 0.106 0.016 0.001
12 -0.004 -0.029 -0.025 -0.004 0.000