ULTRA LMB

BLUE BIRD CORPORATION Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2004-05-18
Personnel D.L. and K.D.
Temperature (°F) 70
Humidity (%) 90
Wind Direction sw
Wind Speed (MPH) 8
Barometer (in.Hg) 30.2

Test Results

Inspect tow equipment-bus interface A safe and adequate connections was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connections was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift wrecker.
Description and location of any structural damage
General Comments No problems were encountered with the towing interface or the tow during testing.