C40LF

NEW FLYER Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2004-08-19
Personnel S.C. & T.S.
Temperature (°F) 73
Humidity (%) 83
Wind Direction WSW
Wind Speed (MPH) 8
Barometer (in.Hg) 30.0

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the bus.
Towing Comments A safe and adequate connection was made between the tow equipment and the wrecker.
Description and location of any structural damage No damage observed.
General Comments A front lift tow was performed incorporating a hydraulic under lift wrecker.