CHALLENGER

CHAMPION BUS INC. Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 2004-05-04 Temperature: 70
Personnel: D.L., E.L., and E.D. Test Load (lbs): 18750
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.039 -0.039 0.000 0.000
2 0.000 0.028 0.028 0.000 0.000
3 0.000 0.063 0.063 0.002 0.002
4 0.000 0.057 0.057 0.000 0.000
5 0.000 0.036 0.036 0.000 0.000
6 0.000 0.510 0.510 0.065 0.065
7 0.000 0.524 0.524 0.073 0.073
8 0.000 0.025 0.025 0.009 0.009
9 0.000 0.035 0.035 0.005 0.005
10 0.000 0.032 0.032 0.000 0.000
11 0.000 0.015 0.015 0.003 0.003
12 0.000 -0.048 -0.048 0.005 0.005

Loading Sequence: 1

Date: 2004-05-04 Temperature: 70
Personnel: D.L., E.L., and E.D. Test Load (lbs): 18750
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.042 -0.042 -0.002 -0.002
2 0.000 0.030 0.030 0.000 0.000
3 0.002 0.064 0.062 0.003 0.001
4 0.000 0.057 0.057 0.001 0.001
5 0.000 0.039 0.039 0.003 0.003
6 0.065 0.572 0.507 0.004 -0.061
7 0.073 0.586 0.513 0.078 0.005
8 0.009 0.031 0.022 0.012 0.003
9 0.005 0.036 0.031 0.008 0.003
10 0.000 0.033 0.033 0.001 0.001
11 0.003 0.019 0.016 0.006 0.003
12 0.005 -0.051 -0.056 0.001 -0.004