CHALLENGER

CHAMPION BUS INC. Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2004-07-28
Personnel S.C., T.S. and E.D.
Temperature (°F) 76
Humidity (%) 66
Wind Direction w
Wind Speed (MPH) 4
Barometer (in.Hg) 30.04

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift wrecker. No problems were encountered.
Description and location of any structural damage
General Comments None